01
Apply to the affected area
Work on a cool surface in the shade. Keep the product away from unpainted plastic, rubber and glass edges.
Estimated Transit (US / CA):Nov 17 - Nov 21
Other regions: Confirm transit estimates after dispatch for EU / UK, Middle East, Asia-Pacific, Latin America and sea freight in the quotation.
Trade terms: EXW / FCA / FAS / FOB / CFR / CIF / CPT / CIP / DAP / DPU / DDP (Incoterms® 2020). Confirm the agreed term, named place and responsibilities in the contract.
A liquid treatment for rust spots and ferrous deposits on compatible painted panels and alloy wheels. Confirm the surface, contamination and selected formula before use in preparation for polishing, coating or sealing.
Brake or rail deposits can leave rust-colored spots on paint and wheel areas. Assess the deposit and the product’s removal performance on the actual surface before further correction or coating.
Before-and-after images are illustrative. Results depend on the actual contamination and surface; confirm on a test area before wider use.
Paint and wheels can carry different deposits and surface treatments. Confirm the product’s compatibility and procedure for each intended area.
Confirm dilution and dwell time in the current technical sheet before the first vehicle, and verify the result on a small test area.
01
Work on a cool surface in the shade. Keep the product away from unpainted plastic, rubber and glass edges.
02
Keep the surface wet for the dwell time stated for the selected formula, and monitor the treatment without assuming a universal color-change indicator.
03
Rinse thoroughly and dry. Proceed to polishing, coating or sealing only where compatible with the actual surface and technical guidance.
A 500 ml trigger bottle and 1–20 L HDPE containers for workshops, distributors and repacking programs. Confirm blank or customer-artwork labels for the quoted order.
| Pack | Format | Typical use |
|---|---|---|
| 500 ml | Trigger spray bottle | Detailing cart · sample format |
| 1 L | HDPE container | Small workshop |
| 2 L | HDPE container | Workshop refill |
| 5 L | HDPE container | Detailing workshop |
| 10 L | HDPE container | Higher-volume workshop |
| 20 L | HDPE container | Distributor · repacking |
Discuss closure and carton changes for the quoted order volume.
Discuss blank or custom labels for bottles and containers. Agree the artwork, product name and label layout, then confirm the proof before printing.
For bulk supply from Shenzhen, specify the destination port, pack mix and label choice, then request the current quotation and agreed terms.
| Port | Shenzhen, CN |
| Incoterms | FOB / CIF / CFR / DDP / DAP |
| Payment | 100% payment in advance |
| Pack mix | Mixed sizes — confirm the order configuration |
| Lead time | Confirmed at order |
Compatible painted panels and clear coat with rust deposits, plus compatible alloy wheels, hub faces, bolt holes, chrome and stainless trim. Keep off unpainted plastic, rubber and hot surfaces.
Confirm the actual paint or wheel surface and follow the technical-sheet dilution and dwell time. Test first, work in the shade on a cool panel and never let the product dry.
Discuss a 500 ml trial bottle and test it on the intended panel or wheel before selecting larger packs and labels. Confirm current sample terms.
Blank or customer-artwork labels are offered for the quoted packaging program. Agree the label content and any container changes with CHISI before ordering.
Tell CHISI the required sizes, blank or custom-label choice and destination. Request the quotation and agreed packaging specification.
Shipping, delivery and after-sales arrangements — confirm the terms for your order.
Stock products are normally dispatched in 3–7 days. Confirm availability and order readiness with the team.
Custom and OEM orders are normally dispatched within 15 days; confirm the project schedule in the contract or proforma invoice before tooling or printing.
Standard A4 film samples are free, with shipping charged separately; other sample sizes are quoted on request.标准 A4 膜样免费,运费另计;其他样品尺寸按需报价。
Bulk buyers can contact their representative to agree on order coordination, claim handling and after-sales arrangements — confirm the applicable contract and warranty terms.
The figures above are planning references, not arrival commitments. Confirm route, mode, transit, customs and duty responsibilities in the current quotation and contract.
The following table is a reference for discussing the selected trade term. Confirm availability, named place, costs and risk allocation in the contract — not a universal shipping offer.
| Incoterm | Freight & insurance | Risk Transfer | Import Duty |
|---|---|---|---|
| EXWEx Works | Buyer; collection at the plant | At the plant | Buyer |
| FCAFree Carrier | Buyer, following seller export clearance | Handover to the carrier | Buyer |
| CPTCarriage Paid To | Seller pays freight to the named place | Handover to the first carrier | Buyer |
| CIPCarriage & Insurance Paid | Seller pays freight and insurance (ICC A) | Handover to the first carrier | Buyer |
| DAPDelivered at Place | Seller delivers, without unloading | At the named place | Buyer |
| DPUDelivered at Place Unloaded | Seller delivers and unloads | After unloading at the named place | Buyer |
| DDPDelivered Duty Paid | Seller delivers, with import duty paid | At the named place | Seller |
| Incoterm | Freight & insurance | Risk Transfer | Import Duty |
|---|---|---|---|
| FASFree Alongside Ship | Buyer, from alongside the vessel | Alongside the vessel | Buyer |
| FOBFree On Board | Buyer, once goods are on board | On board the vessel | Buyer |
| CFRCost & Freight | Seller pays sea freight to the port | On board the vessel | Buyer |
| CIFCost, Insurance & Freight | Seller pays freight and insurance (ICC C) | On board the vessel | Buyer |
Need another shipping term or phased shipment? Discuss Shipping Terms with CHISI.
Provide the destination address, forwarder or warehouse details and order scope. Confirm service availability, routing and trade terms before booking.
Send the postal code and order quantity — confirm whether DDP is available and agree on customs, HS classification, duty and alternative terms in the quotation.
Contact the team promptly with photos or video. Follow the agreed inspection, insurance and claim procedure for the shipment.
Discuss FCL or LCL consolidation and confirm the MOQ, compatibility and packing requirements for each SKU.
Discuss the nominated forwarder, pickup point, EXW or FCA terms and required export documents before collection.
Confirm roll wrapping, cartons, pallets and edge protection for the selected SKU. Discuss neutral or private-label packaging through the packaging program and confirm any required pallet drawing.
Confirm the available report, sample or batch scope, methods and chemical safety documents before ordering. Agree on any origin documents required for customs.
CHISI New material
A company specializing in automotive film solutions.
Innovation is our foundation, and materials science is our DNA.
Contact Us